PUBLIC HOUSING PROJECT

Contract N100

Client : Abu Dhabi General Services Company PJSC (“Musanada”)
Consultant : Dorsch Consult
Value : AED 212.2 Million
Duration : May 2009 – May 2011
Location : Neima – Al Ain

 

THE CHALLENGE

As for many new developments, NBHH has carried out for N100 contract the complete infrastructure works in preparation for the projected housing units.
The contract included the civil and electromechanical works for roads, sewerage and water networks.

 

SCOPE OF WORKS

• Earthworks, site clearance, levelling, disposal of unsuitable cut material, import of new fill material and linear grading between housing plots
• Roads and foot paths
• Two roundabouts with four entry/exit arms each
• Four ‘T-junction’ access points onto existing roads, including acceleration/deceleration lanes
• Road markings and traffic signs
• Services and utility ducts and crossings
• Relocation/replacement of 11 KV over headline
• Rerouting of electrical underground cables of various voltages
• Building for 11/0.4KV distribution substations and 11KV switching station
• 11 KV panel, LV panel distribution transformers
• 11 KV network for distribution substations
• 400 V networks from the distribution substation including supply & installation of feeder pillar and service turrets
• Underground ducts for 11 KV, LV and service cables networks
• Earthing system for distribution substation, switching station and feeder pillars
• Design of the street lighting as per the contract specifications
• 8 and 14 m high poles and control cabinet including foundations and cabling works
• Sewer network and associated manholes and chambers and connections to buildings
• Pipe installation by NDM Works, micro tunnelling or pipe Jacking
• Potable water network
• Firehydrants
• Strom water network and associated chambers
• Connection of fall new network to existing ones