DS-240/ Part A - House Connection and Miscellaneous Works (Deira & Hatta)
CLIENT
Dubai Municipality
CONSULTANT
Stantec
CONTRACT VALUE
AED 186 Million
DURATION
April 08, 2025 to April 07, 2027
LOCATION
Dubai
THE CHALLENGE
Live roads - Maintain traffic flow and property access during pipeline installation. Logistics - Coordinate crews, equipment, and materials across work locations throughout Dubai, from Deira to Hatta. Authority coordination - Coordinate with the relevant authorities to obtain the required no-objection certificates (NOCs) and permits for thousands of work orders.
SCOPE OF WORK
- 001Construct sewerage and stormwater drainage networks, including associated sewer house connections.
- 002Install approximately 34.29 km of gravity pipelines for the sewerage and stormwater drainage networks.
- 003Install 11.45 km of HDPE pipelines, including associated chamber works and horizontal directional drilling (HDD).
- 004Install 3.60 km of pipelines using Non-Disruptive Road Crossing (NDRC) methods.
- 005Construct 303 manholes and 1,282 chambers for the sewerage and stormwater drainage networks.
- 006Upgrade the existing pump station.
- 007Carry out emergency works on irrigation, sewerage, and stormwater pipelines and pump stations.