DS-240/ Part A - House Connection and Miscellaneous Works (Deira & Hatta)
DUBAI PROJECTS

DS-240/ Part A - House Connection and Miscellaneous Works (Deira & Hatta)

CLIENT

Dubai Municipality

CONSULTANT

Stantec

CONTRACT VALUE

AED 186 Million

DURATION

April 08, 2025 to April 07, 2027

LOCATION

Dubai

THE CHALLENGE

Live roads - Maintain traffic flow and property access during pipeline installation. Logistics - Coordinate crews, equipment, and materials across work locations throughout Dubai, from Deira to Hatta. Authority coordination - Coordinate with the relevant authorities to obtain the required no-objection certificates (NOCs) and permits for thousands of work orders.

SCOPE OF WORK
  • 001Construct sewerage and stormwater drainage networks, including associated sewer house connections.
  • 002Install approximately 34.29 km of gravity pipelines for the sewerage and stormwater drainage networks.
  • 003Install 11.45 km of HDPE pipelines, including associated chamber works and horizontal directional drilling (HDD).
  • 004Install 3.60 km of pipelines using Non-Disruptive Road Crossing (NDRC) methods.
  • 005Construct 303 manholes and 1,282 chambers for the sewerage and stormwater drainage networks.
  • 006Upgrade the existing pump station.
  • 007Carry out emergency works on irrigation, sewerage, and stormwater pipelines and pump stations.
THE FOUNDATION

Committed to excellence in every kilometer, every structure.

Nael & Bin Harmal Hydroexport — architect of the UAE's evolving horizon since 1991.

ABU DHABI

Phone : +971 2 6273344
Fax no. : +971 2 6271165
Location : 6th Floor, Unit 601, Nael & Bin Harmal (NBH) Tower, Zayed The First St. Al Khalidiyah, Abu Dhabi UAE
PO Box : 28102

DUBAI

Phone : +971 4 3599940
Fax no. : +971 4 3599941
Location : 206, Building No: 6 Bay Square, Business Bay, Dubai UAE
PO Box : 29703

© 2026 Nael & Bin Harmal Hydroexport LLC. All rights reserved.