AED 706.91 Million
DURATION
December 24, 2024 to December 23, 2027
LOCATION
THE CHALLENGE
SCOPE OF WORK
- 001Execution of Drainage network for industrial communities
- 002Industrial First and Second including sewer connection to existing septic tanks and divert the flow to network, storm water drainage system
- 003Sewerage Gravity Network by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions etc.