THE CHALLENGE
Ongoing road projects - Coordinate work with the ongoing road project to execute the works. Existing Etihad Rail crossing - Etihad Rail Crossing by NDRC. Existing bridges - Works close to the foundations of Existing Bridges. Limited groundwater discharge points - Manage dewatering with insufficient discharge points for the pumped groundwater.
SCOPE OF WORK
- 001Construct 11,110 m of stormwater trunk line, including 1,193 m by open-cut excavation and 9,917 m by Non-Disruptive Road Crossing (NDRC). The works include excavating 46 pits and constructing 52 manholes.
- 002Construct drainage ditches as part of the stormwater drainage system.
- 003Construct a stormwater lifting station.