DUBAI PROJECTS
Stormwater Drainage System
CLIENT
CONSULTANT
CONTRACT VALUE
AED 265.38 Million
DURATION
January 14, 2025 to January 15, 2027
LOCATION
THE CHALLENGE
SCOPE OF WORK
- 001Storm water drainage system by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions and Storm Water Lifting Station, storm network pipelines in trenches Removal of Existing Pipes
- 002Demolition of Existing Chambers Special pipe laying by NDRC Method Storm drainage manholes construction Reinstatement Works Reinstatement of roads Reinstatement of footpaths Reinstatement of gardens/grassed areas Connections etc.