DS 306/1: Stormwater Drainage System in Jebel Ali and Developers Areas–Phase 1
DUBAI PROJECTS

DS 306/1: Stormwater Drainage System in Jebel Ali and Developers Areas–Phase 1

CLIENT

Dubai Municipality

CONSULTANT

Stantec

CONTRACT VALUE

AED 265.38 Million

DURATION

January 14, 2025 to January 15, 2027

LOCATION

Dubai

THE CHALLENGE

Ongoing road projects - Coordinate work with the ongoing road project to execute the works. Existing Etihad Rail crossing - Etihad Rail Crossing by NDRC. Existing bridges - Works close to the foundations of Existing Bridges. Limited groundwater discharge points - Manage dewatering with insufficient discharge points for the pumped groundwater.

SCOPE OF WORK
  • 001Construct 11,110 m of stormwater trunk line, including 1,193 m by open-cut excavation and 9,917 m by Non-Disruptive Road Crossing (NDRC). The works include excavating 46 pits and constructing 52 manholes.
  • 002Construct drainage ditches as part of the stormwater drainage system.
  • 003Construct a stormwater lifting station.
THE FOUNDATION

Committed to excellence in every kilometer, every structure.

Nael & Bin Harmal Hydroexport — architect of the UAE's evolving horizon since 1991.

ABU DHABI

Phone : +971 2 6273344
Fax no. : +971 2 6271165
Location : 6th Floor, Unit 601, Nael & Bin Harmal (NBH) Tower, Zayed The First St. Al Khalidiyah, Abu Dhabi UAE
PO Box : 28102

DUBAI

Phone : +971 4 3599940
Fax no. : +971 4 3599941
Location : 206, Building No: 6 Bay Square, Business Bay, Dubai UAE
PO Box : 29703

© 2026 Nael & Bin Harmal Hydroexport LLC. All rights reserved.