DUBAI PROJECTS
Interconnecting Urgent Development to Sewerage System
CLIENT
CONSULTANT
CONTRACT VALUE
AED 349.85 Million
DURATION
February 19, 2025 to August 08, 2027
LOCATION
THE CHALLENGE
Tender covers the construction of sewerage systems strengthen the existing sewerage network by providing adequately sized Link sewer connections to these existing sewerage network, decommissioning of subsidiary pumping station including main Pumping station, providing sewerage connections to the new developments and/or un-served areas; conveying the generated wastewater to the existing functional system; provisions of future connections from another deep link sewer and with future sewage tunnel(s). Lifting Pump Station with a capacity of 700 L/s is proposed at terminal point, of deep link sewer.
SCOPE OF WORK
- 001Site clearance
- 002Construction of the following link sewer pipelines by Non-Disruptive Methods (NDM) for 600, 700, 800, 900, 1000, 1500, and 2500mm Dia pipes and associated manholes with total length 12181.35 meters, 67 NDM Pits and manholes
- 003Construction of open cut Sewerage Works includes Pipeline, Manhole Construction & House Connection Pipeline & Chamber works (pipe line 3,704-meter, House connection 3,906 meter and manholes 62 Nos)
- 004Construction works of new sewage lifting pump station
- 005Construct Stub-out Pipes for future connections, Manholes
- 006Abandonment/ Demolition of Existing Subsidiary Pumping Stations