
EPC for ASAB Full Field Development Project
Abu Dhabi Company for Onshore Oil Operation (ADCO)
Petrofac International Ltd
AED 290 Million
September 2009 to September 2013
Western Region – Abu Dhabi
The project is located in the western region of Abu Dhabi, and is part of the oil and gas field of ASAB. Petrofac has awarded the contract to NBHH in 2008 for a contract duration of 44 months. Given the location of the project, in the middle of the desert, and taking into account the requirements and constraints related to working with the oil and gas industry, the logistics became a critical aspect of the works and the strict implementation of all safety, quality and environmental procedures became a must. Over 1000 staff from NBHH were trained to work in this environment, and were an integral part of this challenging achievement.
- 001Construction of RCC buildings for sub stations at various locations
- 002Construction of central control building with specialized finishes
- 003Service buildings and gate house including all the MEP services in highly sensitive oil field area, designated as hazardous area, where the stringent control of safety and quality procedures is exercised by the client
- 004Asphalt road works, gulch road as well as fixing of Kerbstone and Interlock paving
- 005Installation of concrete batching plant
