AL AIN PROJECTS
Al Noud Phase – 2 Infrastructure and Landscape Works (D&B)
CLIENT
ALDAR
CONSULTANT
DAR
CONTRACT VALUE
AED 1.04 Billion
DURATION
February 2026 to February 2028
LOCATION
Al Ain
THE CHALLENGE
The object of the project is the construction of roads and infrastructure works for AL-NOUD Phase 2. The works include the construction of internal and external roads, street lighting, potable water networks, rainwater drainage systems, sewerage systems, irrigation networks, electricity grids, and Public Utilities. The scope further extends to cycle tracks, substations, and comprehensive hard and soft landscaping works.
SCOPE OF WORK
- 001The Project includes the construction of infrastructure and streetscapes for the AL-NOUD Phase 2 development. The detailed scope is as follows :
- 002001 Road Works: Implementation of comprehensive road networks including excavation (389,360 m3), massive filling operations (1,522,793 m3), asphalt paving (331,494 m3), cycle tracks, and precast concrete paving blocks.
- 003002 Sewerage Network: Installation of an HDPE piping network (48,005 m) including 634 manholes and 751 house connections.
- 004003 Storm Water Drainage: Construction of a drainage system utilizing GRP pipes (66,643 m) with 227 manholes, 1,360 inlets, and 107 catch basins leading to a final outfall.
- 005004 Water Works: Development of a potable water network featuring 67,354 m of pipes and 88 valve chambers.
- 006005 Irrigation Works: Installation of an irrigation system with HDPE pipes (41,882 m), 56 valve chambers, and associated pumping and control stations.
- 007005 Power Network: Provision of a high-voltage electrical grid consisting of 11Kv cables (62,945 m) and 66 substations.
- 008006 Street Lighting: Installation of a complete street lighting system including 70,000 m of cabling and 1,507 lighting poles.
- 009007 Landscaping & Urban Furniture: Delivery of hard and soft landscaping works, including the installation of 15 bus shelters and extensive kerbstone work.