AL AIN PROJECTS
D&B Mazyad Residential Project – Eastern Sector – A
CLIENT
Aldar
CONSULTANT
AECOM
CONTRACT VALUE
AED 981.9 Million
DURATION
February 2026 to March 2028
LOCATION
Al Ain
THE CHALLENGE
The object of the project is the construction of infrastructure and streetscapes for the D&B MAZYAD RESIDENTIAL PROJECT – EASTERN SECTOR-A. The works include the construction of internal and external roads, street lighting, potable water networks, rainwater drainage systems, sewerage systems, and irrigation networks. The scope further extends to electricity grids, telecommunication ducts, cycle tracks, and comprehensive landscaping works to support the residential development.
SCOPE OF WORK
- 001Road Works: Massive earthmoving and paving operations including excavation (825,318 m3), filling (708,868 m3), asphalt road construction (290,579 m2), cycle tracks (28,454 m2), and over 150,282 m of kerbing.
- 002Sewerage Network: Installation of main sewer pipelines (28,036 m) and house connection lines (28,094 m), including 602 manholes and 542 connection chambers.
- 003Storm Water Network: Construction of a drainage system featuring main pipelines (36,983 m), 250 manholes, and 1,200 gullies/catch basins.
- 004Potable Water & Fire Fighting: Installation of a water network comprising main pipelines (67,446 m), 327 valve chambers, and 423 fire hydrants.
- 005Irrigation Network: Development of an irrigation system with main pipelines (54,825 m) and 121 valve chambers.
- 006Power & Electrical Works: Provision of an extensive electrical grid including 11kV cables (35,999 m), low voltage cables (135,000 m), 62 substations, and 559 feeder pillars.
- 007Telecommunications & MCC: Installation of telecom ducts (113,579 m) and chambers (404 units), along with a dedicated MCC network featuring 41,189 m of ducting.
- 008Street Light Works: Implementation of a street lighting system with 41,966 m of cabling, 1,130 light poles, and 20 control cabinets.