Al Hili Residential Complex – 71 Buildings
The Committee of Residential Development
Dorsch Gruppe
AED 597 Million
July 2007 to July 2009
Al Ain
One of the biggest residential developments in Al Ain, this project is Located in the Al Hili industrial area and covers over 37 hectares. NBHH has contracted this project on a turnkey basis, noting that the broad scope encompassed both the infrastructure works and the construction/finishing of the buildings. The latter scope necessitated taking advantage of all the in house knowledge and experience for a challenging timely completion. 71 buildings, G+6 and G+5, 160,000 m2 of residential areas, have been completed in approximately 2 years. NBHH has also built a staff and labor camp at a close distance from the project to accommodate over 2500 staff who worked on a double shift basis.
- 001Site clearance, diversion and protection of existing services ; Infrastructure networks including 15,000 m2 of roads, 4.5 km of sewerage, 3 km of potable water lines, irrigation and 2 km of drainage pipes; 6,500 m2 of soft landscaping and play equipment for kids; Concrete sub-structure & super structure and Block works. Total of 115,000 m3 of concrete and 115,000 T of steel; Aluminium plain, perforated & mirror finish false ceiling; Aluminium doors, curtain wall windows; All interior finishing, wooden joinery works, kitchens, sanitary wares & accessories, tiling, painting works, etc..; Ducted split air conditioning system; 142 elevators; Central gas network; Fire protection & fire alarm systems; All electrical, electromechanical and communication installations; Testing and commissioning of all works; The maintenance of the works for a period of 365 days