Construction of Internal Roads Works in Al Ain City-Stage 28
AL AIN PROJECTS

Construction of Internal Roads Works in Al Ain City-Stage 28

CLIENT

ALDAR

CONSULTANT

Dar Al Handasah Consultants

CONTRACT VALUE

AED 478.40 Million

DURATION

April 14, 2025 to April 13, 2027

LOCATION

Al Ain

THE CHALLENGE

Project consists of 11 sub-projects falling in different regions of AACM (Zakhir 1, Zakhir 2, Midtown, Mazyad, Salamat 1, Salamat 2, Um Ghaffa 1, Um Ghaffa 2, Abu Samra, Al Saad, Al Aqabiyyah) areas

SCOPE OF WORK
  • 001Demolition and site clearance, Earth works
  • 002Road Works: Grading, paving, and signing and marking
  • 003Water Supply System: main water supply network
  • 004Wastewater System: Pipe installation and house connections
  • 005Stormwater Drainage: Pipes, manholes, inlets, etc.
  • 006Power Network, Telecom Infrastructure, Street Lighting: Installation of lighting systems
  • 007Landscape (optional): hardscape, landscape and furnishing etc.
  • 008Installation of irrigation pipes and a new reservoir, including connections to existing systems
  • 009Utility Buildings etc.
THE FOUNDATION

Committed to excellence in every kilometer, every structure.

Nael & Bin Harmal Hydroexport — architect of the UAE's evolving horizon since 1991.

ABU DHABI

Phone : +971 2 6273344
Fax no. : +971 2 6271165
Location : 6th Floor, Unit 601, Nael & Bin Harmal (NBH) Tower, Zayed The First St. Al Khalidiyah, Abu Dhabi UAE
PO Box : 28102

DUBAI

Phone : +971 4 3599940
Fax no. : +971 4 3599941
Location : 206, Building No: 6 Bay Square, Business Bay, Dubai UAE
PO Box : 29703

© 2026 Nael & Bin Harmal Hydroexport LLC. All rights reserved.