ABU DHABI PROJECTS
Riyadh City North – Phase 7 B Infrastructure and Streetscape
CLIENT
Aldar
CONSULTANT
Parsons International
CONTRACT VALUE
AED 669 Million
DURATION
November 2021 to November 2023
LOCATION
Abu Dhabi
THE CHALLENGE
The object of the project is the construction of roads and infrastructure works for Phase 7 of Riyadh City North, Abu Dhabi. The works will include the construction of internal and external roads, lighting, potable water network, rainwater drainage systems, sewerage systems, fire-fighting systems, traffic control systems, irrigation networks, electricity grids, and Public Utilities.
SCOPE OF WORK
- 001Site Clearance
- 002Sewer network (Line-19,818m, Manhole-142No's)
- 003Storm water works (Line – 19415m, Inlet/catch basin- 2998 No's, discharge pond)
- 004Road Works: – (Excavation – 584,950m3, Fill – 367,700m3, Subbase – 225,965 m3 Asphalt – 12,651 ton, Tiles – 833,830m2, Kerbstone – 472,720m)
- 005Street lighting works (Cables = 121,605m, Poles – 2383 No's)
- 006Electrical works (Cables – 737,324m, feeder pillar- 561No's, 22/0.4kv Distribution Substation – 76No's)
- 007Water works (Line – 25,796m, Valve chambers-216 No's, Fire hydrant – 164 No's, house connections,)
- 008Gas Works – (Line – 313,622m, valves – 7348 No's)
- 009Telecommunication works (JRC's – 206 No's, Ducts – 38,284m)
- 010Irrigation Works (Line 440,250m, Valves – 381 No's, pumping station – 2 No's)
- 011Landscaping Works (Hard & Soft landscaping works)
- 012Falcon Eye Network (Conduits – 225,382m)