Construction of Bawadi Mall

 

Client : Nael Investments
Consultant : Shankland Cox International
Value : AED 1.065 Billion
Duration : October 2006 to April 2009
Location : Al Ain

 

NBHH construction project of the largest mall in Al Ain (Bawadi Mall), the prestige of Al Ain and made known throughout United Arab Emirates and surrounding communities.  Bawadi Mall Project is a multi-purpose development comprising 145,000 sq.m shopping mall, with 400 retail outlets left as ‘shell and core’ to enable fit out works for leading brands such as: Carrefour, Marks & Spencer, Centre Points, Toys ‘R’ Us, Paris Gallery, ACE Hardware, Homes ‘R’ Us, Various International Fast Foods & Restaurants Outlets and Cafės, etc.

 

SCOPE OF WORKS

Road Works, Water Networks, Sewerage Systems, Civil, structural and finishing works of the Mall and Buildings, MEP Works, Irrigation & Landscaping works, LPG Systems, Complete Electrical Systems, BMS Systems, A Heritage Village of 15,000m², Management Offices, District cooling plant, 8,400T capacity, Slaughterhouse, Staff accommodation, Car park of 3500 cars capacity.

 

---------------------------------------------------------

 

AL HILI RESIDENTIAL COMPLEX - 71 Buildings

 

Client : The Committee of Residential Development
Consultant : Dorsch Gruppe
Value : AED 597 Million
Duration : July 2007 to July 2009
Location : Al Ain

 

One of the biggest residential developments in Al Ain, this project is Located in the Al Hili industrial area and covers over 37 hectares. NBHH has contracted this project on a turnkey basis, noting that the broad scope encompassed both the infrastructure works and the construction/finishing of the buildings. The latter scope necessitated taking advantage of all the in house knowledge and experience for a challenging timely completion. 71 buildings, G+6 and G+5, 160,000 m2 of residential areas, have been completed in approximately 2 years. NBHH has also built a staff and labor camp at a close distance from the project to accommodate over 2500 staff who worked on a double shift basis.

 

SCOPE OF WORKS

Site clearance, diversion and protection of existing services ; Infrastructure networks including 15,000 m2 of roads, 4.5 km of sewerage, 3 km of potable water lines, irrigation and 2 km of drainage pipes; 6,500 m2 of soft landscaping and play equipment for kids; Concrete sub-structure & super structure and Block works. Total of 115,000 m3 of concrete and 115,000 T of steel; Aluminium plain, perforated & mirror finish false ceiling; Aluminium doors, curtain wall windows; All interior finishing, wooden joinery works, kitchens, sanitary wares & accessories, tiling, painting works, etc..; Ducted split air conditioning system; 142 elevators; Central gas network; Fire protection & fire alarm systems; All electrical, electromechanical and communication installations; Testing and commissioning of all works; The maintenance of the works for a period of 365 days

 

---------------------------------------------------------

 

Saadiyat Beach Apartment

 

Client : Nael & Bin Harmal Hydroexport
Consultant : Dorsch Gruppe
Value : AED 501 Million
Duration : October 2015 to October 2020
Location : Abu Dhabi

 

The Saadiyat Beach Apartments project is located on Saadiyat Island, an island just to the north of the city of Abu Dhabi. Saadiyat will be a master planned community of approximately 150,000 residents and will offer island users a range of housing, employment, retail, entertainment and outdoor parks and natural preservation areas.

The project site is a Greenfield development located on the land parcels SB-21. The site land use is assigned as residential and the total GFA of approximately 77,037 m2.

The project comprises three developments featuring high quality 5 residential apartments of G+4 and G+5 (Premium Buildings) with basement and associated communal facilities buildings, parks and ancillary services buildings.

 

---------------------------------------------------------

 

Al Shuaiba Residential Complex- 162 Villas

 

Client : Musanada
Consultant : Dorsch Gruppe
Value : AED 303 Million
Duration : May 2014 to April 2018
Location : Al Shuaiba, Al Ain

 

The proposed Residential Complex for Musanada is coming up on Plot no. 31-001-077-007 Al Shuaiba, Al Ain. The project, having an overall plot area of around 420,000m² comprise of 162 typical G+1 residential villas, each having a gross floor area of 531 m² and plot area of 1,080 m². Covered parking spaces for vehicle provided for each unit. The Project is identified to qualify under 2-Pearl Rating for Estidama.

 

SCOPE OF WORKS

Earthworks (excavation, foundation, backfilling, disposal and anti-termite works); Concrete works (substructure and super structure, road constructions, street lighting); Block works and sanitary works; Aluminum, windows and doors; Joinery, cabinetry and kitchen, works, floor tiling; Electrical supply and distribution network; Fire protection and fire alarm systems,; Solar Water Heater systems; Potable water supply systems, drainage systems; Sewerage systems, storm water systems, service connections; Construction of 5 substations.

 

---------------------------------------------------------

 

Grand Cosmopolitan Hotel

 

Client : Nael Bin Harmal
Consultant : EDMAC Consultant
Value : AED 210 Million
Duration : October 2014 to October 2018
Location : Dubai

 

Proposed 2 b + g +  m + 6 roof building, Construction of 5 star hotel having 236 rooms which includes suit rooms, rest rooms, handicapped rooms and normal rooms along with Spa, Swimming pools, Ladies amenities,  and all relevant construction including MEP works and Fitting out works.

 

---------------------------------------------------------

 

*** For Complete List of Projects kindly email us info@nbhh.ae