DAMAC Islands, Dubai – UAE Deep Services Package

P179.01

Client : Damac
Consultant : Khatib Alami
Value : AED 219.98 Million
Duration : November 01, 2025 to October 21, 2027
Location : Dubai

 

SCOPE OF WORKS

The main area of works include:

  • Gravity sewerage networks in different dia uPVC and GRP pipeline with all related works
  • Deep gravity Storm water networks with different dia with all related fittings
  • Gravity subsurface drainage networks
  • Utility Connections to external existing networks
  • NDRC works
  • Ponds Construction and Lifting Stations works etc

 

---------------------------------------------------------

 

Al Amerah Infrastructure Package # 01

P154046/2025/T/008

Client : ALDAR
Consultant : AECOM
Value : AED 1.63 Billion
Duration : May 26, 2025 to November 26, 2027
Location : Al Ain

 

The project comprises construction, completion, testing, commissioning and maintenance of the ‘Deep Services Package’ of DAMAC ISLANDS. The details of the ‘Deep Services Package’ of DAMAC Islands for this package totalling to approx. 279.33 ha are outlined

 

SCOPE OF WORKS

The main area of works include:

  • Design & construction of a new 33/11kV Brick-built Primary Substation at Al Amerah
    - 33kV GIS switchgear, 11kV AIS/GIS/HYBRID switchgear, 3 nos. 33/11.5kV power transformers of 20MVA, 2 nos. 500kVA, 11/0.415kV auxiliary transformers, RTU system, HVAC systems, Fire Fighting system
    Building Services
  • Civil works
    - new internal roadwork network, cycle ways, footways, bus stops, parking, existing road network, new sewerage network, new stormwater network, new potable water and firefighting network, new street lighting network, Telecom services, new ADMCC ducting and manholes , Future ducts, new Streetscape/ Sikas and public realm, new primary irrigation network, soft landscaping, Service house connections for power, telecom, sewerage, water and storm water works etc.

 

---------------------------------------------------------

 

Part A - House Connection and Miscellaneous Works (Deira & Hatta)

DS-240

Client : Dubai Municipality
Consultant : Stantec
Value : AED 186 Million
Duration : May 12, 2025 to May 11, 2027
Location : Dubai

 

 

SCOPE OF WORKS

The main area of works include:

  • Construction of sewers drains and irrigation lines manholes
  • Valve chambers, pumping/lift stations, pressure mains, gully connection
  • House connections and disconnections and all associated works
  • Submersible pumping station (Type A) and manhole pumping station
  • NDM works, investigation, overhaul, cleaning, repair, or replacement of any part of the existing sewerage
  • Drainage or irrigation systems etc.

 

---------------------------------------------------------

 

Construction of Internal Roads Works in Al Ain City-Stage 28

P157005/2024/T/002

Client : ALDAR
Consultant : Dar Al Handasah Consultants
Value : AED 478.40 Million
Duration : April 14, 2025 to April 13, 2027
Location : Al Ain

 

Project consists of 11 sub-projects falling in different regions of AACM (Zakhir 1, Zakhir 2, Midtown, Mazyad, Salamat 1, Salamat 2, Um Ghaffa 1, Um Ghaffa 2, Abu Samra, Al Saad, Al Aqabiyyah) areas

 

SCOPE OF WORKS

The main area of works include:

  • Demolition and site clearance, Earth works
  • Road Works: Grading, paving, and signing and marking
  • Water Supply System: main water supply network
  • Wastewater System: Pipe installation and house connections
  • Stormwater Drainage: Pipes, manholes, inlets, etc.
  • Power Network, Telecom Infrastructure, Street Lighting: Installation of lighting systems
  • Landscape (optional): hardscape, landscape and furnishing etc.
  • Installation of irrigation pipes and a new reservoir, including connections to existing systems
  • Utility Buildings etc.

 

---------------------------------------------------------

 

Interconnecting urgent Development to DM Sewerage System-Deira Area

DS-288

Client : Dubai Municipality
Consultant : ITAl Consult
Value : AED 349.85 Million
Duration : February 19, 2025 to August 08, 2027
Location : Dubai

 

Tender DS 288 covers the construction of sewerage systems strengthen the existing sewerage network by providing adequately sized Link sewer connections to these existing sewerage network (Deira Area), decommissioning of subsidiary pumping station (PS-Central, G-30, G-27 & Q-1) including main Pumping station PS-Q, within the Deira area; providing sewerage connections to the new developments and/or un-served areas; conveying the generated wastewater to the DM existing functional system; provisions of future connections from another deep link sewer and with future sewage tunnel(s). Lifting Pump Station (LPS-Q) with a capacity of 700 L/s is proposed at terminal point, of deep link sewer PS-Q.

 

SCOPE OF WORKS

The main area of works include:

  • Site clearance
  • Construction of the following link sewer pipelines by Non-Disruptive Methods (NDM) for 600, 700, 800, 900, 1000, 1500, and 2500mm Dia pipes and associated manholes with total length 12181.35 meters, 67 NDM Pits and manholes
  • Construction of open cut Sewerage Works includes Pipeline, Manhole Construction & House Connection Pipeline & Chamber works (pipe line 3,704-meter, House connection 3,906 meter and manholes 62 Nos)
  • Construction works of new sewage lifting pump station LPS-Q
  • Construct Stub-out Pipes for future connections, Manholes
  • Abandonment/ Demolition of Existing Subsidiary Pumping Stations (PS G-30, PS G27, PS Q-1, PS- Central)

 

---------------------------------------------------------

 

Stormwater Drainage System in Jebel Ali and Developers Areas–Phase 1

DS-306/1

Client : Dubai Municipality
Consultant : Stantec
Value : AED 265.38 Million
Duration : January 14, 2025 to January 15, 2027
Location : Dubai

 

 

 

SCOPE OF WORKS

The main area of works include:

  • Storm water drainage system by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions and Storm Water Lifting Station, storm network pipelines in trenches Removal of Existing Pipes
  • Demolition of Existing Chambers Special pipe laying by NDRC Method Storm drainage manholes construction Reinstatement Works Reinstatement of roads Reinstatement of footpaths Reinstatement of gardens/grassed areas Connections etc.

 

---------------------------------------------------------

 

Sewerage and Stormwater Drainage Systems for Industrial Communities (128, 215, 242, 612, 613)

DS-429

Client : Dubai Municipality
Consultant : Stantec
Value : AED 706.91 Million
Duration : December 24, 2024 to December 23, 2027
Location : Dubai

 

 

 

SCOPE OF WORKS

The main area of works include:

  • Execution of Drainage network for industrial communities of Al Khabaisi, Umm Ramool, and Ras Al Khor
  • Industrial First and Second including sewer connection to existing septic tanks and divert the flow to DM network, storm water drainage system
  • Sewerage Gravity Network by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions etc.

 

---------------------------------------------------------

 

Main Construction Works - Infrastructure and Landscaping
Works (Package 1 & 3), Al Khrair (Al Noud)

P154001/2022/C/002 A

Client : Aldar
Consultant : AECOM
Value : AED 799.9 Million
Duration : October 24, 2022 to August 23, 2024
Location : Al Ain

 

Al Noud Project formerly Al Khrair district is a low-density Emirati housing development community, composed of several land uses, mostly being residential (3017 units), together with religious, schools, commercial, government, community facilities, open spaces, etc. spanning around 651 Hectares. Al Noud site is located approximately 13 km south-east of the Al Ain City Centre. It is about 169 km from Abu Dhabi International Airport via E-22 Highway and about 41 km from the Al Ain International Airport via the Truck Road.

 

SCOPE OF WORKS

The main area of works include:

  • Roads
  • Pavements
  • Signage and way findings
  • Potable water
  • Storm Water
  • Wastewater
  • Irrigation
  • Power
  • Street Lighting
  • Landscaping including public realm

 

---------------------------------------------------------

 

Construction of Roads and Infrastructure Works for Al Laim Neighborhood,
Al Foah area of Al Ain

 

Client : Aldar
Consultant : AECOM
Value : AED 688.9 Million
Duration : November 2022 to August 2024
Location : Al Ain

 

The project “Roads and Infrastructure Works for Al Laim Neighborhood, Al Foah Area in Al Ain region)” objective is to provide all Infrastructure disciplines such as, Roads, Storm Water, Street lighting, Sewerage and Potable Water network, Irrigation,  etc., for a new neighborhood of the existing Al Foah district of Al Ain Region for the proposed new plots. Al Laim Neighborhood is located within Al Foah area in the City of Al Ain, approximately 20km north-east from Al Ain Central District and 21.4km from Al Ain International Airport. he project boundary represents a total site area of 317 hectares and measures approximately 2400m & 1680m at its longest and widest points, respectively.

Al Laim Neighborhood is composed of mainly residential private villas, government housing plots in addition to government, community facilities and commercial plots.

 

SCOPE OF WORKS

  • Roads
  • Sewerage
  • Potable Water
  • Storm Water
  • Street Lighting
  • Power
  • Landscaping,
  • Irrigation

 

---------------------------------------------------------

 

Riyadh City North - Phase 7 B Infrastructure and Streetscape

T001012-2019-0215

Client : Aldar
Consultant : Parsons International
Value : AED 669 Million
Duration : November 2021 to November 2023
Location : Abu Dhabi

 

The object of the project is the construction of roads and infrastructure works for Phase 7 of Riyadh City North, Abu Dhabi. The works will include the construction of internal and external roads, lighting, potable water network, rainwater drainage systems, sewerage systems, fire-fighting systems, traffic control systems, irrigation networks, electricity grids, and Public Utilities.

 

SCOPE OF WORKS

The Project includes construction of infrastructure, Streetscapes for villas. The Brief summary is as follows:

  • Site Clearance
  • Sewer network (Line-19,818m, Manhole-142No’s)
  • Storm water works (Line – 19415m, Inlet/catch basin- 2998 No’s, discharge pond)
  • Road Works: – (Excavation – 584,950m3, Fill – 367,700m3, Subbase - 225,965 m3 Asphalt – 12,651 ton, Tiles – 833,830m2, Kerbstone – 472,720m)
  • Street lighting works (Cables = 121,605m, Poles – 2383 No’s)
  • Electrical works (Cables – 737,324m, feeder pillar- 561No’s, 22/0.4kv Distribution Substation – 76No’s)
  • Water works (Line – 25,796m, Valve chambers-216 No’s, Fire hydrant – 164 No’s, house connections,)
  • Gas Works - (Line – 313,622m, valves – 7348 No’s)
  • Telecommunication works (JRC’s – 206 No’s, Ducts – 38,284m)
  • Irrigation Works (Line 440,250m, Valves – 381 No’s, pumping station – 2 No’s)
  • Landscaping Works (Hard & Soft landscaping works)
  • Falcon Eye Network (Conduits – 225,382m)

 

---------------------------------------------------------

 

Riyadh City South - Phase 2 Infrastructure & Streetscape

T-001012-2019-0185

Client : Modon Properties
Consultant : ARCADIS
Value : AED 564.7 Million
Duration : March 2020 to May 2022
Location : Abu Dhabi

 

The Project includes for the construction for the infrastructure works and public realm to the the ROW for the Phase 2 development area. The total Site area for the project is 8,890,483.00 m2.

 

SCOPE OF WORKS

The Project includes construction of infrastructure, Streetscapes for villas. The Brief summary is as follows:

  • This will include main Infrastructure such as Sewer Network is almost 86 km of uPVC & GRP pipes.
  • Storm Water Network is almost 104 km of GRP pipes.
  • Construction of approximately 112,559 m of HDPE potable water networks.
  • Irrigation network within Phase 2 is approximately 78,756 m.
  • Street lighting control cabinets and distribution boards.
  • Gas distribution network.
  • Construction of roadways consists of approximately 744,000 m2.
  • Power Works.
  • Telecommunication Networks.
  • Public Realm Works.
  • Landscape (hard and soft).
  • Drainage Networks.
  • Signage & Wayfinding etc.

 

---------------------------------------------------------

 

Al Ain Asset Enhancement Scheme

Contract O1537

Client : Abu Dhabi Sewerage Services Company
Consultant : Hyder Consulting Middle East Ltd.
Value : AED 761 Million
Duration : November 2010 to October 2012
Location : Al Ain

 

Construction of Trunk Sewer Network & TSE Infrastructure - Part 2.

The Al Ain Asset Enhancement Scheme is intended to address a mixture of strategic and conceptual needs. AES is being implemented in parallel with other components of the Capital Investment Program (CIP).

The contract includes:

The construction of a new deep interceptor trunk sewer from the existing Mezyad trunk sewer in the center of Al Ain City to a new WWTW at Al Hamah. It is noted that approximately 53 km in length needed to be constructed by micro tunneling.

The construction of a new TSE pumping station at Al Hamah WWTW and an Intermediate TSE Pumping Station with 2

reservoirs and chlorination facilities. Each of the pumping stations has a capacity of approximately 2200L/s.

Construction of twin pumping mains of approximately 42.3 km trench length, from the TSE pumping station at Al Hamah to the Intermediate Pumping Station and from the Intermediate pumping station to the existing pumping station at M10.

The scope of the work is divided into two packages, noting that package 2 has been awarded to NBHH on 11th October 2010 with a completion date and handing over set for the 10th October 2012.

 

SCOPE OF WORKS

  • 23 km of sewerage gravity lines. Various pipes diameters 1000 mm, 1200 mm, 1400 mm, 1600 mm and 1800 mm. 10 km constructed by open cut method and 13 km by micro tunnelling. Invert depth varies between 5 m and 19 m
  • 6.5 km of gravity sewer lateral with different pipes diameters from 160 to 1000 mm extended from the existing pumping main with invert depth varying from 2 to 17 m
  • Improvement of gravity sewer lines for PN8 with different diameters 160 mm to 500 mm diameter, with length of 1.5 km and invert depth from 5 to 10 m
  • 4.3 km for the ‘T’ line and main sewerage lines Mazeed, and sewerage gravity line. Pipes diameters from 160 mm to 800 mm. Invert depth from 1 m to 9 m
  • 258 manholes
  • Pumping main sewer lines for treated sewerage water
  • 1.8 km of pumping main sewer line treated water 1200 mm diameter from Zakher to M10
  • 3.5 km of treated pumping main 1200mm diameter from the treated pumping station at Zakher to locate of the 1st branch
  • 5.7 km of treated sewerage pumping main lines 800 mm dia. from the location of the 1st branch to the 2nd branch
  • 2.6 km from pumping main lines for the treated water sewers of 600 mm diameter, from the location of the 2nd branch to M10
  • 8 flow control valve chambers; 12 close out gate valve chambers; 27 air valve chambers; 25 washout chambers; 7 discharge chambers and number of flow meter chambers
  • Demolition works: Emptying and demolishing of 6 existing pumping stations

 

---------------------------------------------------------

 

*** For Complete List of Projects kindly email us info@nbhh.ae