Sewerage and Stormwater Drainage Systems for Industrial Communities
AED 706.91 Million
December 24, 2024 to December 23, 2027
- 001Execution of Drainage network for industrial communities
- 002Industrial First and Second including sewer connection to existing septic tanks and divert the flow to network, storm water drainage system
- 003Sewerage Gravity Network by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions etc.

Dubai Metro – Utilities Diversion, Protection and Relocation
RTA
Systra / Parsons
AED 412 Million
December 2005 to August 2009
Dubai
Every infrastructure project planned in the middle of an active city is poised to encounter and mitigate various risks, mostly in relation to existing underground utilities. The Dubai Metro project was not an exception. The detection, protection and eventually the diversion of existing utilities was a challenging and critical task for NBHH especially where the underground metro stations, cut and cover tunnels, or piling foundations had to be constructed. The latter construction activities had to be carried out while minimizing the disturbance to the end users and Dubai residents. In that respect, our company managed to overcome all the different challenges, whether foreseen or unforeseen, for a project duration that spanned for three and half years.
- 001Obtaining No Objection Certificates (NOC) from the relevant government departments
- 002Preparation of shop drawings and method statements
- 003Trial pits, often by hand digging for initial identification and inspection
- 004Temporary works such as shoring for deep excavation, dewatering, saw cutting of asphalt
- 005Reinstatement of roads and pavements
- 006Supply of all materials and provision of all necessary equipment
- 007Relocation and protection of existing underground pipes of diameters from 100 mm to 1400 mm for various kind of utilities such as water, sewerage, stormwater drainage, irrigation etc… Including construction of manholes, chambers and connection to existing networks
- 008Relocation and protection of existing underground cables and ducts for electricity (ADWEA) and telecommunication (Etisalat)
- 009Micro tunneling and directional drilling for underground crossings and the installation of cables, ducts and pipes
Interconnecting Urgent Development to Sewerage System
AED 349.85 Million
February 19, 2025 to August 08, 2027
Tender covers the construction of sewerage systems strengthen the existing sewerage network by providing adequately sized Link sewer connections to these existing sewerage network, decommissioning of subsidiary pumping station including main Pumping station, providing sewerage connections to the new developments and/or un-served areas; conveying the generated wastewater to the existing functional system; provisions of future connections from another deep link sewer and with future sewage tunnel(s). Lifting Pump Station with a capacity of 700 L/s is proposed at terminal point, of deep link sewer.
- 001Site clearance
- 002Construction of the following link sewer pipelines by Non-Disruptive Methods (NDM) for 600, 700, 800, 900, 1000, 1500, and 2500mm Dia pipes and associated manholes with total length 12181.35 meters, 67 NDM Pits and manholes
- 003Construction of open cut Sewerage Works includes Pipeline, Manhole Construction & House Connection Pipeline & Chamber works (pipe line 3,704-meter, House connection 3,906 meter and manholes 62 Nos)
- 004Construction works of new sewage lifting pump station
- 005Construct Stub-out Pipes for future connections, Manholes
- 006Abandonment/ Demolition of Existing Subsidiary Pumping Stations
Stormwater Drainage System
AED 265.38 Million
January 14, 2025 to January 15, 2027
- 001Storm water drainage system by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions and Storm Water Lifting Station, storm network pipelines in trenches Removal of Existing Pipes
- 002Demolition of Existing Chambers Special pipe laying by NDRC Method Storm drainage manholes construction Reinstatement Works Reinstatement of roads Reinstatement of footpaths Reinstatement of gardens/grassed areas Connections etc.
DAMAC Islands, Dubai – UAE Deep Services Package
Damac
Khatib Alami
AED 219.98 Million
November 01, 2025 to October 21, 2027
Dubai
- 001Gravity sewerage networks in different dia uPVC and GRP pipeline with all related works
- 002Deep gravity Storm water networks with different dia with all related fittings
- 003Gravity subsurface drainage networks
- 004Utility Connections to external existing networks
- 005NDRC works
- 006Ponds Construction and Lifting Stations works etc

Grand Cosmopolitan Hotel
Nael Bin Harmal
EDMAC Consultant
AED 210 Million
October 2014 to October 2018
Dubai
Proposed 2 b + g + m + 6 roof building, Construction of 5 star hotel having 236 rooms which includes suit rooms, rest rooms, handicapped rooms and normal rooms along with Spa, Swimming pools, Ladies amenities, and all relevant construction including MEP works and Fitting out works.
House Connection and Miscellaneous Works
AED 186 Million
May 12, 2025 to May 11, 2027
- 001Construction of sewers drains and irrigation lines manholes
- 002Valve chambers, pumping/lift stations, pressure mains, gully connection
- 003House connections and disconnections and all associated works
- 004Submersible pumping station (Type A) and manhole pumping station
- 005Works, investigation, overhaul, cleaning, repair, or replacement of any part of the existing sewerage
- 006Drainage or irrigation systems etc.