Design & Construction of TSE Pump Station in the Logistics District of Dubai South
CLIENT
Dubai South
CONSULTANT
KEO
CONTRACT VALUE
AED 170.73 Million
DURATION
December 15, 2025 to August 14, 2027
LOCATION
Dubai
THE CHALLENGE
This project 276/SE/25 Design and Construction of TSE Pump Station in the Logistics District of Dubai South has been initiated by Dubai South for the Design and Construction of TSE Pump Station along with supply and discharge lines for the pumping station within Dubai South area, a 145 sq.km development centered on Al Maktoum International Airport, in south of Dubai, UAE
SCOPE OF WORK
- 0011800 Dia Supply Line (8742 Lm) Including 05 Air Valve, 05 Wash Valve Chamber, 01 Proposed Valve Chamber, 01 Flow Control Valve Chamber, 01 Future Connection Chamber
- 0021200 Dia Discharge Line (7152 Lm), including 04 Air Valve, 04 Wash Valve Chamber, 1 Proposed Valve Chamber, 07 Future Connection Chamber
- 003The Design & Build scope includes the complete design, supply, installation, testing, and commissioning of a TSE Pump Station with a capacity of 50,000 m³/day, a 20,000 m³ storage tank, and approximately 9 km supply and 7 km discharge GRP pipelines of DN 1,200 mm. The works cover all civil, mechanical, electrical, MEP, piping, pumping systems, controls, instrumentation, SCADA with remote connectivity, transformers as per DEWA requirements, and associated approvals, in compliance with Dubai Municipality and relevant sewerage authorities