SHABHAT RESIDENTIAL NEIGHBORHOOD

30 km of roads and utilities

Client : ALDAR Properties PJSC
Consultant : AECOM Middle East
Value : AED 190 Million
Duration : March 2007 – June 2009
Location : Al Ain

 

THE CHALLENGE

The construction of a road network and associated services installation to the Al Shabhat area of the City of Al Ain, including:
• Sewerage network and associated manholes and chambers
• Stormwater network and associated manholes and chambers
• Potable water supply network and house connections
• Electrical distribution
• Street lighting and signage
• Road construction
• Kerbing and block paving

 

SCOPE OF WORK

• Construction of 30 km roads complete with roundabouts, footpath, parking areas, drive ways, utility ducts etc…
• Supply & laying of 32 km sewerage lines. 200 to 350 mm diameter GRP pipes with associated manholes, chambers and house connections
• Submersible pumping station complete with all M&E works
• Supply & laying of approximately 30 km of stormwater drainage. 600 to 1000 mm diameter RC pipes, 350 to 500 mm diameter GRP pipes and 200 to 300 mm diameter UPVC pipes with associated manholes/chambers, gullies and wadi outfalls
• Construction of 40 km of water network. DN 160 mm, 225 mm and 355 mm HDPE pipeline complete with valve chambers and all associated works for portable water as per ADWEA/AADC standards
• Relocation of existing LV/HV cable network, supply and installation of 10-20 m high street lighting poles complete with cabling, terminations, control cabinets, service turrets and feeder pillars. Construction of 6 nbr. sub stations, complete with supply, installation, testing and commissioning of all electrical equipment
• Relocation of existing telecommunication network including diversion, new cable laying and construction of joint boxes under ETISALAT supervision