Sewerage and Stormwater Drainage Systems for Industrial Communities (128, 215, 242, 612, 613)
DS-429
Client : Dubai Municipality
Consultant : Stantec
Value : AED 706.91 Million
Duration : December 24, 2024 to December 23, 2027
Location : Dubai
SCOPE OF WORKS
The main area of works include:
- Execution of Drainage network for industrial communities of Al Khabaisi, Umm Ramool, and Ras Al Khor
- Industrial First and Second including sewer connection to existing septic tanks and divert the flow to DM network, storm water drainage system
- Sewerage Gravity Network by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions etc.
---------------------------------------------------------

DUBAI METRO - Utilities Diversion, Protection and Relocation
Client : RTA
Consultant : Systra / Parsons
Value : AED 412 Million
Duration : December 2005 to August 2009
Location : Dubai
Every infrastructure project planned in the middle of an active city is poised to encounter and mitigate various risks, mostly in relation to existing underground utilities. The Dubai Metro project was not an exception.
The detection, protection and eventually the diversion of existing utilities was a challenging and critical task for NBHH especially where the underground metro stations, cut and cover tunnels, or piling foundations had to be constructed. The latter construction activities had to be carried out while minimizing the disturbance to the end users and Dubai residents.
In that respect, our company managed to overcome all the different challenges, whether foreseen or unforeseen, for a project duration that spanned for three and half years.
SCOPE OF WORKS
- Obtaining No Objection Certificates (NOC) from the relevant government departments
- Preparation of shop drawings and method statements
- Trial pits, often by hand digging for initial identification and inspection
- Temporary works such as shoring for deep excavation, dewatering, saw cutting of asphalt
- Reinstatement of roads and pavements
- Supply of all materials and provision of all necessary equipment
- Relocation and protection of existing underground pipes of diameters from 100 mm to 1400 mm for various kind of utilities such as water, sewerage, stormwater drainage, irrigation etc... Including construction of manholes, chambers and connection to existing networks
- Relocation and protection of existing underground cables and ducts for electricity (ADWEA) and telecommunication (Etisalat)
- Micro tunnelling and directional drilling for underground crossings and the installation of cables, ducts and pipes
---------------------------------------------------------

Interconnecting urgent Development to DM Sewerage System-Deira Area
DS-288
Client : Dubai Municipality
Consultant : ITAl Consult
Value : AED 349.85 Million
Duration : February 19, 2025 to August 08, 2027
Location : Dubai
Tender DS 288 covers the construction of sewerage systems strengthen the existing sewerage network by providing adequately sized Link sewer connections to these existing sewerage network (Deira Area), decommissioning of subsidiary pumping station (PS-Central, G-30, G-27 & Q-1) including main Pumping station PS-Q, within the Deira area; providing sewerage connections to the new developments and/or un-served areas; conveying the generated wastewater to the DM existing functional system; provisions of future connections from another deep link sewer and with future sewage tunnel(s). Lifting Pump Station (LPS-Q) with a capacity of 700 L/s is proposed at terminal point, of deep link sewer PS-Q.
SCOPE OF WORKS
The main area of works include:
- Site clearance
- Construction of the following link sewer pipelines by Non-Disruptive Methods (NDM) for 600, 700, 800, 900, 1000, 1500, and 2500mm Dia pipes and associated manholes with total length 12181.35 meters, 67 NDM Pits and manholes
- Construction of open cut Sewerage Works includes Pipeline, Manhole Construction & House Connection Pipeline & Chamber works (pipe line 3,704-meter, House connection 3,906 meter and manholes 62 Nos)
- Construction works of new sewage lifting pump station LPS-Q
- Construct Stub-out Pipes for future connections, Manholes
- Abandonment/ Demolition of Existing Subsidiary Pumping Stations (PS G-30, PS G27, PS Q-1, PS- Central)
---------------------------------------------------------

Stormwater Drainage System in Jebel Ali and Developers Areas–Phase 1
DS-306/1
Client : Dubai Municipality
Consultant : Stantec
Value : AED 265.38 Million
Duration : January 14, 2025 to January 15, 2027
Location : Dubai
SCOPE OF WORKS
The main area of works include:
- Storm water drainage system by open cut and Micro tunneling method with all land drainpipes, pipes, manholes, gullies, diversion, and protection of the existing services during construction and demolishing and clearance of site obstructions and Storm Water Lifting Station, storm network pipelines in trenches Removal of Existing Pipes
- Demolition of Existing Chambers Special pipe laying by NDRC Method Storm drainage manholes construction Reinstatement Works Reinstatement of roads Reinstatement of footpaths Reinstatement of gardens/grassed areas Connections etc.
---------------------------------------------------------

DAMAC Islands, Dubai – UAE Deep Services Package
P179.01
Client : Damac
Consultant : Khatib Alami
Value : AED 219.98 Million
Duration : November 01, 2025 to October 21, 2027
Location : Dubai
SCOPE OF WORKS
The main area of works include:
- Gravity sewerage networks in different dia uPVC and GRP pipeline with all related works
- Deep gravity Storm water networks with different dia with all related fittings
- Gravity subsurface drainage networks
- Utility Connections to external existing networks
- NDRC works
- Ponds Construction and Lifting Stations works etc
---------------------------------------------------------

Grand Cosmopolitan Hotel
Client : Nael Bin Harmal
Consultant : EDMAC Consultant
Value : AED 210 Million
Duration : October 2014 to October 2018
Location : Dubai
Proposed 2 b + g + m + 6 roof building, Construction of 5 star hotel having 236 rooms which includes suit rooms, rest rooms, handicapped rooms and normal rooms along with Spa, Swimming pools, Ladies amenities, and all relevant construction including MEP works and Fitting out works.
---------------------------------------------------------

Part A - House Connection and Miscellaneous Works (Deira & Hatta)
DS-240
Client : Dubai Municipality
Consultant : Stantec
Value : AED 186 Million
Duration : May 12, 2025 to May 11, 2027
Location : Dubai
SCOPE OF WORKS
The main area of works include:
- Construction of sewers drains and irrigation lines manholes
- Valve chambers, pumping/lift stations, pressure mains, gully connection
- House connections and disconnections and all associated works
- Submersible pumping station (Type A) and manhole pumping station
- NDM works, investigation, overhaul, cleaning, repair, or replacement of any part of the existing sewerage
- Drainage or irrigation systems etc.
---------------------------------------------------------
*** For Complete List of Projects kindly email us info@nbhh.ae