YAS ISLAND DEVELOPMENT - Multiple Infrastructure Contracts
Client : Aldar Properties
Consultant : Halcrow International Partnership
Value : AED 1.5 Billion
Duration : October 2007 to May 2010
Location : Yas Island - Emirates of Abu Dhabi
As the island was preparing for the first ever Formula One race in Abu Dhabi, NBHH was proudly staking a claim as the group that made it possible for spectators to reach the circuit, and experience the event first hand; Basically, the road networks within the complex and the infrastructure that supports it have been constructed by our group. In that latter event alone, NBHH has contracted and achieved six infrastructure contracts as follows:
- Package 2B, the main infrastructure works contract
- Formula One gateway park, infrastructure and landscaping package
- Underground potable water tank
- Retail Mall phase 1A, roads and infrastructure works
- Ferrari World theme park and environs, roads and utilities works
- Marina area, hard and soft landscaping, roads and infrastructure works
920 staff members and construction workers have participated to the successful completion of this project and to its timely handover. The project team managed all the different road blocks and challenges, delivering the works on schedule, while accommodating design changes and modifications during the course of construction.
SCOPE OF WORKS
- Roads network: 12 km of dual carriage ways
- Underpass: 250 m length
- Pumping station for the underpass
- Street lighting: 10 m and 14 m decorative streetlights plus cabling
- Irrigation: 150 mm to 900 mm pipes: 15 km
- Potable water: 150 mm to 900 mm pipes: 25 km
- Stormwater: 300 mm to 2200 mm pipes: 14 km
- Sewerage: 300 mm to 1200 mm pipes: 12 km
- Telecom cabling: 220 km
- Gas pipes: 10 km
- Car parking: 60,000 m2
- Landscaping and grass: 300,000 m2
- Underground potable water reservoir: 135,000 m3
- Shoring and dewatering for deep excavations
- Piling: 300 piles of various diameters and depth
- Setting up of asphalt plant: production of 230 000 tons of asphalt
---------------------------------------------------------

Construction of Bawadi Mall
Client : Nael Investments
Consultant : Shankland Cox International
Value : AED 1.065 Billion
Duration : October 2006 to April 2009
Location : Al Ain
NBHH construction project of the largest mall in Al Ain (Bawadi Mall), the prestige of Al Ain and made known throughout United Arab Emirates and surrounding communities. Bawadi Mall Project is a multi-purpose development comprising 145,000 sq.m shopping mall, with 400 retail outlets left as ‘shell and core’ to enable fit out works for leading brands such as: Carrefour, Marks & Spencer, Centre Points, Toys ‘R’ Us, Paris Gallery, ACE Hardware, Homes ‘R’ Us, Various International Fast Foods & Restaurants Outlets and Cafės, etc.
SCOPE OF WORKS
Road Works, Water Networks, Sewerage Systems, Civil, structural and finishing works of the Mall and Buildings, MEP Works, Irrigation & Landscaping works, LPG Systems, Complete Electrical Systems, BMS Systems, A Heritage Village of 15,000m², Management Offices, District cooling plant, 8,400T capacity, Slaughterhouse, Staff accommodation, Car park of 3500 cars capacity.
---------------------------------------------------------

Upper Zakum UZ 750 Island Surface Facilities - EPC 2
Client : ZADCO
Consultant : Petrofac International Ltd
Value : AED 808.7 Million
Duration : September 2014 to August 2017
Location : Upper Zakum 750 Islands - Abu Dhabi
The Upper Zakum Oil Field is the largest producing field in ADNOC’s portfolio. It is also the second-largest offshore oil field and the fourth-largest oil field in the world. The UZ750 project involved the construction of four artificial islands, comprising a central complex housing the processing facilities as well as the north, south and west satellite platforms.
SCOPE OF WORKS
- Civil works for Central and West Islands involves settlement monitoring of critical foundations.
- Filing and Grading, Excavation for Foundations and backfilling.
- Road Works.
- RCC Drain Lines for Storm Water.
- Landscaping.
- Demolition Works.
- Building Package – RCC Bldgs. (CNIA & Utility Electric Substation).
- Piling Works and related works such as Geotechnical & Structural Design of Piles.
- Construction of SWI Structures and Outfall Structure.
---------------------------------------------------------

Riyadh City North - Phase 7 B Infrastructure and Streetscape
T001012-2019-0215
Client : Aldar
Consultant : Parsons International
Value : AED 669 Million
Duration : November 2021 to November 2023
Location : Abu Dhabi
The object of the project is the construction of roads and infrastructure works for Phase 7 of Riyadh City North, Abu Dhabi. The works will include the construction of internal and external roads, lighting, potable water network, rainwater drainage systems, sewerage systems, fire-fighting systems, traffic control systems, irrigation networks, electricity grids, and Public Utilities.
SCOPE OF WORKS
The Project includes construction of infrastructure, Streetscapes for villas. The Brief summary is as follows:
- Site Clearance
- Sewer network (Line-19,818m, Manhole-142No’s)
- Storm water works (Line – 19415m, Inlet/catch basin- 2998 No’s, discharge pond)
- Road Works: – (Excavation – 584,950m3, Fill – 367,700m3, Subbase - 225,965 m3 Asphalt – 12,651 ton, Tiles – 833,830m2, Kerbstone – 472,720m)
- Street lighting works (Cables = 121,605m, Poles – 2383 No’s)
- Electrical works (Cables – 737,324m, feeder pillar- 561No’s, 22/0.4kv Distribution Substation – 76No’s)
- Water works (Line – 25,796m, Valve chambers-216 No’s, Fire hydrant – 164 No’s, house connections,)
- Gas Works - (Line – 313,622m, valves – 7348 No’s)
- Telecommunication works (JRC’s – 206 No’s, Ducts – 38,284m)
- Irrigation Works (Line 440,250m, Valves – 381 No’s, pumping station – 2 No’s)
- Landscaping Works (Hard & Soft landscaping works)
- Falcon Eye Network (Conduits – 225,382m)
---------------------------------------------------------

Riyadh City South - Phase 2 Infrastructure & Streetscape
T-001012-2019-0185
Client : Modon Properties
Consultant : ARCADIS
Value : AED 564.7 Million
Duration : March 2020 to May 2022
Location : Abu Dhabi
The Project includes for the construction for the infrastructure works and public realm to the the ROW for the Phase 2 development area. The total Site area for the project is 8,890,483.00 m2.
SCOPE OF WORKS
The Project includes construction of infrastructure, Streetscapes for villas. The Brief summary is as follows:
- This will include main Infrastructure such as Sewer Network is almost 86 km of uPVC & GRP pipes.
- Storm Water Network is almost 104 km of GRP pipes.
- Construction of approximately 112,559 m of HDPE potable water networks.
- Irrigation network within Phase 2 is approximately 78,756 m.
- Street lighting control cabinets and distribution boards.
- Gas distribution network.
- Construction of roadways consists of approximately 744,000 m2.
- Power Works.
- Telecommunication Networks.
- Public Realm Works.
- Landscape (hard and soft).
- Drainage Networks.
- Signage & Wayfinding etc.
---------------------------------------------------------

Saadiyat Beach Apartment
Client : Nael & Bin Harmal Hydroexport
Consultant : Dorsch Gruppe
Value : AED 501 Million
Duration : October 2015 to October 2020
Location : Abu Dhabi
The Saadiyat Beach Apartments project is located on Saadiyat Island, an island just to the north of the city of Abu Dhabi. Saadiyat will be a master planned community of approximately 150,000 residents and will offer island users a range of housing, employment, retail, entertainment and outdoor parks and natural preservation areas.
The project site is a Greenfield development located on the land parcels SB-21. The site land use is assigned as residential and the total GFA of approximately 77,037 m2.
The project comprises three developments featuring high quality 5 residential apartments of G+4 and G+5 (Premium Buildings) with basement and associated communal facilities buildings, parks and ancillary services buildings.
---------------------------------------------------------

EPC for ASAB Full Field Development Project
Client : Abu Dhabi Company for Onshore Oil Operation (ADCO)
Consultant : Petrofac International Ltd
Value : AED 290 Million
Duration : September 2009 to September 2013
Location : Western Region - Abu Dhabi
The project is located in the western region of Abu Dhabi, and is part of the oil and gas field of ASAB.
Petrofac has awarded the contract to NBHH in 2008 for a contract duration of 44 months.
Given the location of the project, in the middle of the desert, and taking into account the requirements and constraints related to working with the oil and gas industry, the logistics became a critical aspect of the works and the strict implementation of all safety, quality and environmental procedures became a must.
Over 1000 staff from NBHH were trained to work in this environment, and were an integral part of this challenging achievement.
SCOPE OF WORKS
- Construction of RCC buildings for sub stations at various locations
- Construction of central control building with specialized finishes
- Service buildings and gate house including all the MEP services in highly sensitive oil field area, designated as hazardous area, where the stringent control of safety and quality procedures is exercised by the client
- Asphalt road works, gulch road as well as fixing of Kerbstone and Interlock paving
- Installation of concrete batching plant
---------------------------------------------------------